
Click here to download a PDF outlining this project.
Client: Holly Energy Partners
Location: El Dorado, KS
Start Date: April 2017
Completion Date: November 2017
A new crude oil pipeline was built to bring product into Holly Energy Partners' crude oil facility in El Dorado, KS. The operator brought the new pipeline into a facility next door to the El Dorado Terminal. They needed a plan for connecting the two facilities. Resolute assisted Holly Energy Partners in developing a plan to connect the new pipeline to their El Dorado facility.
- Project Management
- Procedure Development
- Survey Management
- Material Specifications
- Structural Engineering & Design
- Tank Connection
- Civil Engineering & Design
- Manifold Connection
- Mechanical Engineering & Design
- Resolute Engineering provided engineering and design to assist in developing operational goals. Resolute managed survey contractors, developed P&IDs, designed piping and support to tie in the pipeline to several tie-in points at El Dorado, including manifolds and tanks, and developed and provided tie-in procedures. We provided project management; plan, profile, and isometric; bill of materials; and used AutoCAD Plant 3D. Resolute also designed walkways for valve access and pipe and dike crossing.
- Holly Energy Partners used the design package and procedures created by Resolute Engineering to provide general contractors and material suppliers with specification and information to complete the project.