El Dorado Pipeline Connection

Client: Holly Energy Partners

Location: El Dorado, KS

Start Date: April 2017

Completion Date: November 2017

A new crude oil pipeline was built to bring product into Holly Energy Partners' crude oil facility in El Dorado, KS. The operator brought the new pipeline into a facility next door to the El Dorado Terminal. They needed a plan for connecting the two facilities. Resolute assisted Holly Energy Partners in developing a plan to connect the new pipeline to their El Dorado facility.

  • Project Management
    • Procedure Development
    • Survey Management
    • Material Specifications
  • Structural Engineering & Design
    • Tank Connection
  • Civil Engineering & Design
    • Manifold Connection
  • Mechanical Engineering & Design
  • Resolute Engineering provided engineering and design to assist in developing operational goals. Resolute managed survey contractors, developed P&IDs, designed piping and support to tie in the pipeline to several tie-in points at El Dorado, including manifolds and tanks, and developed and provided tie-in procedures. We provided project management; plan, profile, and isometric; bill of materials; and used AutoCAD Plant 3D. Resolute also designed walkways for valve access and pipe and dike crossing.
  • Holly Energy Partners used the design package and procedures created by Resolute Engineering to provide general contractors and material suppliers with specification and information to complete the project.

 